Login / Signup
S. Jack Hu
Publication Activity (10 Years)
Years Active: 2000-2022
Publications (10 Years): 2
Top Topics
Supplier Selection
Top Venues
Int. J. Prod. Res.
IEEE Trans Autom. Sci. Eng.
CASE
Eur. J. Oper. Res.
</>
Publications
</>
Changbai Tan
,
Kira Barton
,
S. Jack Hu
,
Theodor Freiheit
Integrating optimal process and supplier selection in personalised product architecture design.
Int. J. Prod. Res.
60 (8) (2022)
Mohand Lounes Bentaha
,
Alexandre Dolgui
,
Olga Battaïa
,
Robert J. Riggs
,
S. Jack Hu
Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty.
Int. J. Prod. Res.
56 (24) (2018)
Mohand Lounes Bentaha
,
Olga Battaïa
,
Alexandre Dolgui
,
S. Jack Hu
Second order conic approximation for disassembly line design with joint probabilistic constraints.
Eur. J. Oper. Res.
247 (3) (2015)
Xiaoning Jin
,
Jun Ni
,
S. Jack Hu
,
Guoxian Xiao
,
Qing Chang
Threshold-type admission policy for remanufacturing systems.
CASE
(2014)
Xiaoning Jin
,
S. Jack Hu
,
Jun Ni
,
Guoxian Xiao
Assembly Strategies for Remanufacturing Systems With Variable Quality Returns.
IEEE Trans Autom. Sci. Eng.
10 (1) (2013)
Jialu Liu
,
Sheng Yang
,
Aiguo Wu
,
S. Jack Hu
Multi-state throughput analysis of a two-stage manufacturing system with parallel unreliable machines and a finite buffer.
Eur. J. Oper. Res.
219 (2) (2012)
Liang Zhou
,
Hui Wang
,
Christopher Berry
,
Xin Weng
,
S. Jack Hu
Functional Morphing in Multistage Manufacturing and Its Applications in High-Definition Metrology-Based Process Control.
IEEE Trans Autom. Sci. Eng.
9 (1) (2012)
S. Jack Hu
,
Kathryn E. Stecke
Analysis of automotive body assembly system configurations for quality and productivity.
Int. J. Manuf. Res.
4 (3) (2009)
Y. Y. Wang
,
Tian Huang
,
Xueman Zhao
,
Jiangping Mei
,
Derek G. Chetwynd
,
S. Jack Hu
Finite Element Analysis and Comparison of Two Hybrid Robotsthe Tricept and the TriVariant.
IROS
(2006)
Tian Huang
,
Meng Li
,
Xueman Zhao
,
Jiangping Mei
,
Derek G. Chetwynd
,
S. Jack Hu
Conceptual design and dimensional synthesis for a 3-DOF module of the TriVariant-a novel 5-DOF reconfigurable hybrid robot.
IEEE Trans. Robotics
21 (3) (2005)
Robert F. Webbink
,
S. Jack Hu
Automated generation of assembly system-design solutions.
IEEE Trans Autom. Sci. Eng.
2 (1) (2005)
Theodor Freiheit
,
Yoram Koren
,
S. Jack Hu
Productivity of parallel production lines with unreliable Machines and material handling.
IEEE Trans Autom. Sci. Eng.
1 (1) (2004)
Sheng Yang
,
Cheng Wu
,
S. Jack Hu
Modeling and analysis of multi-stage transfer lines with unreliable machines and finite buffers.
Ann. Oper. Res.
93 (1-4) (2000)