Login / Signup
Patrick Preuss
Publication Activity (10 Years)
Years Active: 2010-2023
Publications (10 Years): 7
Top Topics
Discrete Event Simulation
Long Term
Semiconductor Manufacturing
Operations Management
Top Venues
WSC
</>
Publications
</>
Wolfgang Scholl
,
Patrick Preuss
,
Christoph Laroque
,
Madlene Leißau
Backward Simulation: A Customer-Focused Diversification of Fab Simulation Applications in a Highly Automated Semiconductor Production Line.
WSC
(2023)
Georg Seidel
,
Patrick Preuss
,
Cevahir Canbolat
,
Soo Leen Low
,
Chew Wye Chan
,
Boon Ping Gan
,
Ching Foong Lee
,
Prakash Manogaran
,
Aik Ying Tang
An Integration of Static and Dynamic Capacity Planning for a Ramping Fab.
WSC
(2019)
Wolfgang Scholl
,
Matthias Forster
,
Patrick Preuss
,
André Naumann
,
Hui Ping Ooi
,
Boon-Ping Gan
Bridging the Gap between fab simulation and supply Chain Forecast.
WSC
(2018)
Georg Seidel
,
Patrick Preuss
,
André Naumann
,
Soo Leen Low
,
Chew Wye Chan
,
Boon-Ping Gan
Operator Resource modelling in a Multiple wafer Sizes fabrication Environment using discrete Event simulation.
WSC
(2018)
Georg Seidel
,
Ching Foong Lee
,
Ai Mei Kam
,
Boon-Ping Gan
,
Chew Wye Chan
,
André Naumann
,
Patrick Preuss
Harmonizing operations management of key stakeholders in wafer fab using discrete event simulation.
WSC
(2017)
Marcin Mosinski
,
Tobias Weissgaerber
,
Soo Leen Low
,
Boon-Ping Gan
,
Patrick Preuss
An easy approach to extending a short term simulation model for long term forecast in semiconductor industry.
WSC
(2017)
Wolfgang Scholl
,
Matthias Forster
,
Patrick Preuss
,
André Naumann
,
Boon-Ping Gan
,
Peter Lendermann
Simulation-enabled development lot journey smoothening in a fully-utilised semiconductor manufacturing line.
WSC
(2016)
Patrick Preuss
,
André Naumann
,
Wolfgang Scholl
,
Boon-Ping Gan
,
Peter Lendermann
Enhancement of simulation-based semiconductor manufacturing forecast quality through hybrid tool down time modeling.
WSC
(2014)
Boon-Ping Gan
,
Peter Lendermann
,
Wolfgang Scholl
,
Marcin Mosinski
,
Patrick Preuss
Automatic model verification for semiconductor manufacturing simulation.
WSC
(2013)
Wolfgang Scholl
,
Marcin Mosinski
,
Boon-Ping Gan
,
Peter Lendermann
,
Patrick Preuss
,
Daniel Noack
A multi-stage discrete event simulation approach for scheduling of maintenance activities in a semiconductor manufacturing line.
WSC
(2012)
Wolfgang Scholl
,
Daniel Noack
,
Oliver Rose
,
Boon-Ping Gan
,
Peter Lendermann
,
Patrick Preuss
,
Falk Stefan Pappert
Implementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab.
WSC
(2011)
Wolfgang Scholl
,
Boon-Ping Gan
,
Ming Li Peh
,
Peter Lendermann
,
Daniel Noack
,
Oliver Rose
,
Patrick Preuss
Towards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities.
WSC
(2010)