Data-driven Scheduling for High-mix and Low-volume Production in Semiconductor Assembly and Testing.
Christian John Immanuel S. BoydonYi-Hsin WuCheng-Hung WuPublished in: CASE (2021)
Keyphrases
- data driven
- semiconductor manufacturing
- high levels
- significantly lower
- production scheduling
- high correlation
- scheduling problem
- round robin
- shop floor
- production line
- customer orders
- wafer fabrication
- printed circuit boards
- small size
- manufacturing process
- production planning
- wide range
- high sensitivity
- preventive maintenance
- high rate
- production process
- process planning
- manufacturing cell
- scheduling algorithm
- resource allocation
- gallium arsenide
- real time
- batch processing
- highly correlated
- quality control
- production system
- load balancing
- neural network