Metal layer planning for silicon interposers with consideration of routability and manufacturing cost.
Wen-Hao LiuTzu-Kai ChienTing-Chi WangPublished in: DATE (2014)
Keyphrases
- production planning
- silicon dioxide
- optimal planning
- high speed
- planning problems
- minimum cost
- raw material
- production cost
- planning systems
- neural network
- manufacturing systems
- heuristic search
- quality control
- total cost
- multi layer
- high cost
- production process
- process planning
- decision support
- low cost
- material handling
- spare parts
- search algorithm