Production lot size problem with failure in repair and backlogging derived without derivatives.
Singa Wang ChiuPublished in: Eur. J. Oper. Res. (2008)
Keyphrases
- lot size
- lot sizing
- total cost
- production cost
- production planning
- production process
- finite horizon
- failure rate
- lead time
- multistage
- planning horizon
- setup cost
- mixed integer programming
- raw material
- multi item
- inventory costs
- inventory systems
- optimal solution
- single item
- probability distribution
- special case
- search algorithm