Login / Signup

Current status of reconfigurable assembly systems.

Zhu Ming BiLihui WangSherman Y. T. Lang
Published in: Int. J. Manuf. Res. (2007)
Keyphrases
  • current status
  • assembly systems
  • future directions
  • lot sizing
  • lead time
  • multistage
  • inventory control
  • distribution systems
  • optimal control
  • cost function
  • supply chain
  • capacity expansion
  • lessons learned