Economic lot-size problem for a cleaner manufacturing system with warm-up period.
Amir Hossein NobilAbolfazl KazemiAta Allah TaleizadehPublished in: RAIRO Oper. Res. (2020)
Keyphrases
- manufacturing systems
- lot size
- production cost
- planning horizon
- inventory costs
- production rate
- flexible manufacturing systems
- petri net
- total cost
- production process
- manufacturing environment
- lot sizing
- lead time
- expected cost
- production planning
- setup cost
- raw material
- finite horizon
- supply chain
- multi item
- production system
- complex systems
- service level
- random variables
- objective function
- mixed integer