Login / Signup
Andreas Klemmt
Publication Activity (10 Years)
Years Active: 2008-2017
Publications (10 Years): 4
Top Topics
Preventive Maintenance
Semiconductor Manufacturing
Scheduling Jobs
Flowshop
Top Venues
WSC
Comput. Oper. Res.
</>
Publications
</>
Andreas Klemmt
,
Jens Kutschke
,
Christian Schubert
From dispatching to scheduling: Challenges in integrating a generic optimization platform into semiconductor shop floor execution.
WSC
(2017)
Dirk Doleschal
,
Gottfried Nieke
,
Gerald Weigert
,
Andreas Klemmt
A CP approach for planning lot release dates in a supply chain of semiconductor manufacturing.
WSC
(2016)
Dirk Doleschal
,
Gerald Weigert
,
Andreas Klemmt
Yield integrated scheduling using machine condition parameter.
WSC
(2015)
Martin Romauch
,
Andreas Klemmt
Product mix optimization for a semiconductor fab: Modeling approaches and decomposition techniques.
Comput. Oper. Res.
53 (2015)
Jan Lange
,
Dirk Doleschal
,
Gerald Weigert
,
Andreas Klemmt
Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach.
WSC
(2014)
Jan Lange
,
Gerald Weigert
,
Andreas Klemmt
,
Peter Doherr
Scheduling maintenance tasks with time-dependent synchronization constraints by a CP modeling approach.
WSC
(2013)
Dirk Doleschal
,
Gerald Weigert
,
Andreas Klemmt
,
Frank Lehmann
Advanced secondary resource control in semiconductor lithography areas: From theory to practice.
WSC
(2013)
Andreas Klemmt
,
Martin Romauch
,
Walter Laure
Product mix optimization for a semiconductor fab: modeling approaches and decomposition techniques.
WSC
(2012)
Dirk Doleschal
,
Jan Lange
,
Gerald Weigert
,
Andreas Klemmt
Improving flow line scheduling by upstream mixed integer resource allocation in a wafer test facility.
WSC
(2012)
Sebastian Werner
,
Frank Lehmann
,
Andreas Klemmt
,
Joerg Domaschke
One solver for all - a generic allocation concept for planning and shop floor control.
WSC
(2012)
Andreas Klemmt
,
Lars Mönch
Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing.
WSC
(2012)
Andreas Klemmt
,
Gerald Weigert
An optimization approach for parallel machine problems with dedication constraints: combining simulation and capacity planning.
WSC
(2011)
Andreas Klemmt
,
Jan Lange
,
Gerald Weigert
,
Frank Lehmann
,
Jens Seyfert
A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing.
WSC
(2010)
Andreas Klemmt
,
Gerald Weigert
,
Christian Almeder
,
Lars Mönch
A Comparison of MIP-based Decomposition Techniques and VNS Approaches for Batch Scheduling Problems.
WSC
(2009)
Andreas Klemmt
,
Gerald Weigert
3D-Visualisierung heuristischer Optimierung mit Simulation.
SimVis
(2008)
Andreas Klemmt
,
Sven Horn
,
Gerald Weigert
,
Thomas Hielscher
Simulations-based and solver-based optimization approaches for batch processes in semiconductor manufacturing.
WSC
(2008)