Sign in

Integrated task scheduling and action planning/control for robotic systems based on a max-plus algebra model.

Ning XiTzyh Jong Tarn
Published in: IROS (1997)
Keyphrases
  • robotic systems
  • probability distribution
  • control architecture
  • probabilistic model
  • mathematical model
  • real time
  • multi modal