Login / Signup
A kernel-based control approach for multi-period assets allocation based on lower partial moments.
Mirko Mazzoleni
Gabriele Maroni
Simone Formentin
Fabio Previdi
Published in:
Eng. Appl. Artif. Intell. (2022)
Keyphrases
</>
multi period
production planning
planning horizon
control system
facility location problem
data envelopment analysis
resource allocation
total cost
lot sizing
routing problem
support vector machine
metaheuristic
multistage
input output
optimization problems
probabilistic model
np hard
search space