An Optimal Production Planning and Maintenance Policy for a Multiple-Product and Single Machine under Failure Rate Dependency.
Lahcen MifdalZied HajejSofiène DellagiNidhal RezgPublished in: MIM (2013)
Keyphrases
- production planning
- optimal production
- single machine
- planning horizon
- production process
- infinite horizon
- failure rate
- scheduling problem
- dynamic programming
- release dates
- holding cost
- production cost
- lot sizing
- production rate
- integer programming
- knapsack problem
- processing times
- setup cost
- minimize total
- lot size
- finite horizon
- total cost
- expected cost
- optimal policy
- optimal control
- supply chain
- optimal solution
- sufficient conditions
- asymptotically optimal
- lead time
- linear programming
- production system
- single machine scheduling problem
- state space
- single item
- manufacturing systems