A timing-driven floorplanning algorithm with the Elmore delay model for building block layout.
Tetsushi KoideShin'ichi WakabayashiPublished in: Integr. (1999)
Keyphrases
- building blocks
- mathematical model
- objective function
- probabilistic model
- theoretical analysis
- cost function
- em algorithm
- optimization model
- dynamic programming
- selection algorithm
- recognition algorithm
- computational cost
- input data
- algorithm has been developed
- expectation maximization
- bayesian framework
- final result
- simulated annealing
- search space
- estimation algorithm
- computational complexity
- optimal solution
- tree structure
- computational model
- similarity measure
- algorithm employs
- parameter estimation
- multiple models
- critical path
- filtering algorithm
- matching algorithm
- kalman filter
- closed form
- worst case
- relational databases
- preprocessing
- maximum likelihood
- graphical models
- learning algorithm
- linear model
- search procedure
- prior information
- classification algorithm
- detection algorithm
- significant improvement
- np hard
- mobile robot
- linear programming