A Production Plan Considering Parallel Machines and Deteriorating Effects: Minimizing the Makespan in the Section of Steel Box Girder Processing.
Xiaohua YangRan MaPublished in: Parallel Process. Lett. (2023)
Keyphrases
- parallel machines
- scheduling problem
- total tardiness
- unrelated parallel machines
- minimize total
- precedence constraints
- production system
- sequence dependent setup times
- massively parallel
- raw material
- lot sizing
- setup times
- data processing
- scheduling jobs
- parallel computing
- production line
- open shop
- single server
- release dates
- production scheduling
- decision making
- production planning
- parallel algorithm
- graphical models
- np hard
- weighted tardiness
- objective function