Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method.
Mahyar AlimianVahidreza GhezavatiReza Tavakkoli-MoghaddamReza RamezanianPublished in: Comput. Ind. Eng. (2022)
Keyphrases
- lot sizing
- rolling horizon
- setup times
- multi item
- multistage
- scheduling problem
- setup cost
- single machine
- preventive maintenance
- single item
- objective function
- dynamic programming
- cost function
- mixed integer programming
- combinatorial optimization
- special case
- evolutionary algorithm
- computational complexity
- multi period
- supply chain
- bayesian networks
- production planning