Login / Signup

Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method.

Mahyar AlimianVahidreza GhezavatiReza Tavakkoli-MoghaddamReza Ramezanian
Published in: Comput. Ind. Eng. (2022)
Keyphrases