C
search
search
reviewers
reviewers
feeds
feeds
assignments
assignments
settings
logout
Reza Ramezanian
ORCID
Publication Activity (10 Years)
Years Active: 2009-2022
Publications (10 Years): 16
Top Topics
Scheduling Problem
Top Venues
Comput. Ind. Eng.
Appl. Soft Comput.
Int. J. Prod. Res.
Eng. Appl. Artif. Intell.
</>
Publications
</>
Mahyar Alimian
,
Vahidreza Ghezavati
,
Reza Tavakkoli-Moghaddam
,
Reza Ramezanian
Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method.
Comput. Ind. Eng.
168 (2022)
Reza Ramezanian
,
Sadjad Khalesi
Integration of multi-product supply chain network design and assembly line balancing.
Oper. Res.
21 (1) (2021)
Hamid Tikani
,
Reza Ramezanian
,
Mostafa Setak
,
Tom Van Woensel
Hybrid evolutionary algorithms and Lagrangian relaxation for multi-period star hub median problem considering financial and service quality issues.
Eng. Appl. Artif. Intell.
97 (2021)
Fatemeh Rezaei
,
Amir Abbas Najafi
,
Reza Ramezanian
,
Erik Demeulemeester
Simulation-based priority rules for the stochastic resource-constrained net present value and risk problem.
Comput. Ind. Eng.
160 (2021)
Fatemeh Rezaei
,
Amir Abbas Najafi
,
Reza Ramezanian
Mean-conditional value at risk model for the stochastic project scheduling problem.
Comput. Ind. Eng.
142 (2020)
Arash Zandi
,
Reza Ramezanian
,
Leslie Monplaisir
Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier.
J. Oper. Res. Soc.
71 (6) (2020)
Milad Ghorbani
,
Reza Ramezanian
Integration of carrier selection and supplier selection problem in humanitarian logistics.
Comput. Ind. Eng.
144 (2020)
Reza Ramezanian
,
Mohammad Mahdi Vali Siar
,
Mahdi Jalalian
Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study.
Int. J. Prod. Res.
57 (10) (2019)
Reza Ramezanian
Estimation of the profiles in posteriori ELECTRE TRI: A mathematical programming model.
Comput. Ind. Eng.
128 (2019)
Reza Ramezanian
,
Arsalan Peymanfar
,
Seyed Babak Ebrahimi
An integrated framework of genetic network programming and multi-layer perceptron neural network for prediction of daily stock return: An application in Tehran stock exchange market.
Appl. Soft Comput.
82 (2019)
Amin Saghaeeian
,
Reza Ramezanian
An efficient hybrid genetic algorithm for multi-product competitive supply chain network design with price-dependent demand.
Appl. Soft Comput.
71 (2018)
Hamid Salamati-Hormozi
,
Zhi-Hai Zhang
,
Omid Zarei
,
Reza Ramezanian
Trade-off between the costs and the fairness for a collaborative production planning problem in make-to-order manufacturing.
Comput. Ind. Eng.
126 (2018)
Mohammad Mahdi Vali Siar
,
Saiedeh Gholami
,
Reza Ramezanian
Multi-period and multi-resource operating room scheduling under uncertainty: A case study.
Comput. Ind. Eng.
126 (2018)
Donya Rahmani
,
Reza Ramezanian
A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study.
Comput. Ind. Eng.
98 (2016)
Mehdi Mahmoodjanloo
,
Seyed Parsa Parvasi
,
Reza Ramezanian
A tri-level covering fortification model for facility protection against disturbance in r-interdiction median problem.
Comput. Ind. Eng.
102 (2016)
Reza Ramezanian
,
Abdullah Ezzatpanah
Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem.
Comput. Ind. Eng.
87 (2015)
Reza Ramezanian
,
Mohammad Saidi-Mehrabad
,
Parviz Fattahi
Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system.
Int. J. Comput. Integr. Manuf.
26 (7) (2013)
Reza Ramezanian
,
Donya Rahmani
,
Farnaz Barzinpour
An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search.
Expert Syst. Appl.
39 (1) (2012)
Reza Ramezanian
,
A. Karamouzian
-stage flexible flow-shop" [Annals of Operations Research (2008) 164: 29-40].
Ann. Oper. Res.
172 (1) (2009)