Login / Signup
Elkin Castro
Publication Activity (10 Years)
Years Active: 2011-2018
Publications (10 Years): 3
Top Topics
Construction Industry
Assembly Systems
Multistage
Lot Sizing
Top Venues
Int. J. Prod. Res.
AAMAS
IPAS
Prod. Eng.
</>
Publications
</>
Sabine Teufl
,
Kayode Owa
,
Dirk Steinhauer
,
Elkin Castro
,
Graham Herries
,
Robert John
,
Svetan M. Ratchev
OPTIMISED - Developing a State of the Art System for Production Planning for Industry 4.0 in the Construction Industry Using Simulation-Based Optimisation.
TE
(2018)
Daniele Scrimieri
,
Nikolas Antzoulatos
,
Elkin Castro
,
Svetan M. Ratchev
Automated experience-based learning for plug and produce assembly systems.
Int. J. Prod. Res.
55 (13) (2017)
Nikolas Antzoulatos
,
Elkin Castro
,
Lavindra de Silva
,
André Dionísio Rocha
,
Svetan M. Ratchev
,
José Barata
A multi-agent framework for capability-based reconfiguration of industrial assembly systems.
Int. J. Prod. Res.
55 (10) (2017)
Nikolas Antzoulatos
,
Elkin Castro
,
Lavindra de Silva
,
Svetan M. Ratchev
Interfacing Agents with an Industrial Assembly System for "Plug and Produce": (Demonstration).
AAMAS
(2015)
Nikolas Antzoulatos
,
Elkin Castro
,
Daniele Scrimieri
,
Svetan M. Ratchev
A multi-agent architecture for plug and produce on an industrial assembly platform.
Prod. Eng.
8 (6) (2014)
André Dionísio Rocha
,
Giovanni Di Orio
,
José Barata
,
Nikolas Antzoulatos
,
Elkin Castro
,
Daniele Scrimieri
,
Svetan M. Ratchev
,
Luis Ribeiro
An agent based framework to support plug and produce.
INDIN
(2014)
Nikolas Antzoulatos
,
Elkin Castro
,
Daniele Scrimieri
,
Svetan M. Ratchev
A Multi-Agent System Architecture for Self-configuration.
IPAS
(2014)
Elkin Castro
,
Sanja Petrovic
Combined mathematical programming and heuristics for a radiotherapy pre-treatment scheduling problem.
J. Sched.
15 (3) (2012)
Sanja Petrovic
,
Elkin Castro
A Genetic Algorithm for Radiotherapy Pre-treatment Scheduling.
EvoApplications (2)
(2011)