Two-stage stochastic lot-sizing problem under cost uncertainty.
Zhili ZhouYongpei GuanPublished in: Ann. Oper. Res. (2013)
Keyphrases
- lot sizing
- fixed cost
- setup cost
- multistage
- robust optimization
- rolling horizon
- stochastic optimization
- multi item
- single item
- lot size
- cutting stock
- assembly systems
- production planning
- risk averse
- inventory systems
- total cost
- planning horizon
- lead time
- setup times
- mixed integer
- supplier selection
- mixed integer programming
- holding cost
- integer programming
- production cost
- linear program
- storage space
- search algorithm
- stochastic inventory control
- mixed integer program
- cost sensitive