Login / Signup

The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers.

George LiberopoulosDimitrios G. PandelisOlympia Hatzikonstantinou
Published in: Ann. Oper. Res. (2013)
Keyphrases
  • production system
  • data sets
  • monte carlo
  • stochastic optimization
  • hidden markov models
  • long sequences
  • input data
  • quality control
  • sequence alignment
  • setup cost
  • stochastic context free grammars