Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops.
Mohammad RohaninejadRashed SahraeianBehdin Vahedi NouriPublished in: RAIRO Oper. Res. (2016)
Keyphrases
- multi objective optimization
- lot sizing
- setup times
- scheduling problem
- flowshop
- processing times
- multi objective
- sequence dependent setup times
- evolutionary algorithm
- multi item
- single machine
- multistage
- assembly systems
- rolling horizon
- single item
- single machine scheduling problem
- release dates
- genetic algorithm
- multi objective optimization problems
- production planning
- parallel machines
- nsga ii
- lead time
- cutting stock
- completion times
- pareto optimal
- precedence constraints
- multiple objectives
- differential evolution
- setup cost
- np hard
- multi objective genetic algorithms
- special case
- planning horizon
- tabu search
- multi objective evolutionary algorithms
- lot size
- fixed cost
- optimization algorithm
- lower bound