Due-Date Based Multi-period Part Selection for Flexible Manufacturing Systems with Controllable Processing Times.
Issa B. ZeidHyoung-Ho DohJeong-Hoon ShinDong-Ho LeePublished in: APMS (1) (2018)
Keyphrases
- flexible manufacturing systems
- multi period
- manufacturing systems
- production planning
- planning horizon
- facility location problem
- routing problem
- real time control
- lot sizing
- multi item
- single machine
- total cost
- data envelopment analysis
- random variables
- decision making
- expected cost
- supply chain
- minimize total
- probability distribution