AGV scheduling for automated material distribution: a case study.
Namita SinghP. V. SarngadharanPrabir K. PalPublished in: J. Intell. Manuf. (2011)
Keyphrases
- flexible manufacturing systems
- semi automated
- dynamic scheduling
- manufacturing systems
- random variables
- power law
- scheduling problem
- spatial distribution
- test bed
- uniformly distributed
- flow control
- information retrieval
- resource allocation
- probability distribution
- case study
- fully automated
- real time database systems
- real time control
- parallel machines
- e learning
- information systems