An optimization approach for the lot sizing and scheduling problem in the brewery industry.
Tamara Angélica BaldoMaristela Oliveira SantosBernardo Almada-LoboReinaldo MorabitoPublished in: Comput. Ind. Eng. (2014)
Keyphrases
- lot sizing
- setup times
- scheduling problem
- sequence dependent setup times
- multi item
- multistage
- rolling horizon
- single item
- single machine
- production planning
- flowshop
- parallel machines
- inventory systems
- mixed integer
- precedence constraints
- mixed integer programming
- cutting stock
- lead time
- np hard
- assembly systems
- stochastic inventory control
- processing times
- optimization problems
- setup cost
- lot size
- branch and bound algorithm
- release dates
- mixed integer program
- supplier selection
- single machine scheduling problem
- production system
- search algorithm