Login / Signup

Integrated lot-sizing and cutting stock problem applied to the mattress industry.

Maurício Móz ChristofolettiSilvio Alexandre de AraujoAdriana Cristina Cherri
Published in: J. Oper. Res. Soc. (2021)
Keyphrases
  • lot sizing
  • multistage
  • multi item
  • rolling horizon
  • single item
  • lead time
  • mixed integer
  • setup times
  • scheduling problem
  • assembly systems
  • cutting stock