Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company.
Fabrizio MarinelliMaria Elena NenniAntonio SforzaPublished in: Ann. Oper. Res. (2007)
Keyphrases
- lot sizing
- parallel machines
- multi item
- multistage
- unrelated parallel machines
- rolling horizon
- sequence dependent setup times
- setup times
- single item
- minimize total
- cutting stock
- precedence constraints
- production system
- production planning
- release dates
- mixed integer programming
- scheduling jobs
- mixed integer
- planning horizon
- setup cost
- single server
- multi period
- distributed systems