Discrete Lot-Sizing and Scheduling with Sequence-Dependent Setup Times and Costs Including Deterioration and Perishability Constraints.
Julia PahlStefan VoßDavid L. WoodruffPublished in: HICSS (2011)
Keyphrases
- lot sizing
- sequence dependent setup times
- single item
- setup cost
- mixed integer
- setup times
- multi item
- multistage
- parallel machines
- rolling horizon
- production planning
- mixed integer programming
- lead time
- precedence constraints
- scheduling problem
- planning horizon
- holding cost
- continuous variables
- production cost
- valid inequalities
- total cost
- constraint programming
- resource allocation
- graphical models