Login / Signup

Modelling and Simulation of Human-Centred Assembly Systems - A Real Case Study.

Anna M. LassilaSameh M. SaadTerrence D. PereraTomasz KochJaroslaw Chrobot
Published in: BASYS (2004)
Keyphrases
  • assembly systems
  • human centred
  • inventory control
  • lot sizing
  • multistage
  • optimal control
  • distribution systems
  • linear programming
  • steady state
  • lead time