Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand.
M.-C. WuL.-C. HuangH.-M. HsuT.-S. SuPublished in: J. Oper. Res. Soc. (2011)
Keyphrases
- lot sizing
- lot size
- production rate
- production planning
- inventory systems
- setup cost
- single item
- planning horizon
- multi item
- lead time
- multistage
- wagner whitin
- multi period
- rolling horizon
- assembly systems
- production cost
- production system
- mixed integer programming
- setup times
- mixed integer
- decision making
- cutting stock
- single stage
- total cost
- capacity expansion
- single product
- supply chain
- fixed cost
- production process
- inventory level
- inventory models
- periodic review
- manufacturing systems
- sufficient conditions
- decision makers
- stochastic inventory control