Login / Signup

Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand.

M.-C. WuL.-C. HuangH.-M. HsuT.-S. Su
Published in: J. Oper. Res. Soc. (2011)
Keyphrases