A deteriorating repairable system with stochastic lead time and replaceable repair facility.
Miaomiao YuYinghui TangYonghong FuLemeng PanXiaowo TangPublished in: Comput. Ind. Eng. (2012)
Keyphrases
- lead time
- multi echelon
- assembly systems
- optimal base stock levels
- lot sizing
- supply chain
- periodic review
- inventory systems
- inventory control
- optimal production
- base stock levels
- service level
- planning horizon
- single item
- poisson process
- stochastic inventory
- inventory level
- demand distributions
- setup cost
- random variables
- total cost
- base stock policy
- holding cost
- single product
- stochastic optimization
- base stock policies
- customer demand
- single stage
- lost sales
- independent and identically distributed
- stochastic lead times
- sample path