Towards Measuring the Impact of Technical Debt on Lead Time: An Industrial Case Study.
Bhuwan PaudelJavier Gonzalez-HuertaEhsan ZabardastEriks KlotinsPublished in: CoRR (2024)
Keyphrases
- lead time
- supply chain
- single item
- service level
- inventory control
- lot sizing
- inventory systems
- poisson process
- total cost
- planning horizon
- assembly systems
- infinite horizon
- single product
- random variables
- stochastic lead times
- lot size
- holding cost
- independent and identically distributed
- state space
- setup cost
- dual sourcing
- graphical models