Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs.
Hemen SanatiGhasem MoslehiMohammad Reisi-NafchiPublished in: EURO J. Comput. Optim. (2023)
Keyphrases
- energy efficient
- sequence dependent setup times
- parallel machines
- scheduling problem
- wireless sensor networks
- total weighted tardiness
- total tardiness
- release dates
- energy consumption
- maximum lateness
- precedence constraints
- sensor networks
- minimize total
- single machine scheduling problem
- single machine
- setup times
- parallel machine scheduling problem
- parallel computing
- flowshop
- base station
- shared memory
- lot sizing
- energy efficiency
- list scheduling
- single server
- routing algorithm
- routing protocol
- data transmission
- np hard
- branch and bound algorithm