Scheduling of two-machine flowshop with outsourcing lead-time.
Eun-Seok KimIk Sun LeePublished in: Comput. Oper. Res. (2022)
Keyphrases
- flowshop
- lead time
- scheduling problem
- sequence dependent setup times
- minimizing total tardiness
- maximum lateness
- supply chain
- preventive maintenance
- parallel machines
- job shop
- bicriteria
- setup times
- single machine
- lot sizing
- processing times
- service level
- precedence constraints
- minimizing makespan
- single item
- setup cost
- job processing times
- tabu search
- special case
- inventory control
- release dates
- np hard
- infinite horizon
- random variables
- total weighted tardiness
- completion times
- job shop scheduling problem
- identical parallel machines
- planning horizon
- total cost
- strongly np hard
- inventory level
- holding cost
- risk management
- simulated annealing
- genetic algorithm