Optimal lot-sizing in a two-stage system with auto-correlated arrivals.
Silvanus T. EnnsPing ZhuPublished in: WSC (2005)
Keyphrases
- lot sizing
- single item
- multistage
- multi item
- rolling horizon
- setup times
- cutting stock
- assembly systems
- inventory systems
- fixed cost
- planning horizon
- setup cost
- lot size
- lead time
- production planning
- joint replenishment
- dynamic programming
- worst case
- stochastic inventory control
- bin packing
- supplier selection
- optimal solution
- expected cost
- combinatorial auctions
- upper bound
- mixed integer programming
- optimal strategy
- optimal control
- production system
- probability distribution
- decision making