Subcontracting and lot-sizing with constant capacities.
Hark-Chin HwangPublished in: Math. Program. (2022)
Keyphrases
- lot sizing
- multistage
- multi item
- single item
- rolling horizon
- production planning
- cutting stock
- mixed integer
- mixed integer programming
- assembly systems
- setup times
- wagner whitin
- inventory systems
- setup cost
- supplier selection
- production rate
- lead time
- mixed integer program
- stochastic inventory control
- planning horizon
- fixed cost
- parallel machines
- scheduling problem
- machine learning