Joint scheduling of parallel machines and AGVs with sequence-dependent setup times in a matrix workshop.
Mingpeng MiaoHongyan SangYu-Ting WangBiao ZhangMeng-Xi TianPublished in: Comput. Ind. Eng. (2023)
Keyphrases
- parallel machines
- sequence dependent setup times
- scheduling problem
- total weighted tardiness
- total tardiness
- unrelated parallel machines
- precedence constraints
- maximum lateness
- weighted tardiness
- release dates
- minimize total
- parallel computing
- shared memory
- setup times
- single machine
- single server
- lot sizing
- single machine scheduling problem
- flowshop
- np hard
- image segmentation