The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network.
Abdolreza RoshaniMassimo PaolucciDavide GiglioMelissa DemartiniFlavio TonelliMaxim A. DulebenetsPublished in: Ann. Oper. Res. (2023)
Keyphrases
- lot sizing
- sequence dependent setup times
- single item
- setup cost
- wireless sensor networks
- multi item
- energy consumption
- setup times
- multistage
- single machine scheduling problem
- base station
- production planning
- mixed integer
- lead time
- holding cost
- parallel machines
- sensor nodes
- routing protocol
- resource consumption
- mixed integer programming
- data transmission
- expected cost
- release dates
- planning horizon
- total cost
- precedence constraints