Login / Signup

Board-Level Lifetime Prediction for Power Board of Balise Transmission Module in High-Speed Railways.

Wei ShangGuanYu ZangHuashen WangMichael G. Pecht
Published in: IEEE Access (2020)
Keyphrases
  • high speed
  • prediction accuracy
  • power consumption
  • levels of abstraction
  • real time
  • prediction model
  • low power
  • artificial neural networks
  • bit rate
  • prediction error
  • data transmission
  • power distribution
  • circuit board