Using a Random Coefficient Regression Model to Jointly Determine the Optimal Critical Level and Lot Sizing.
Xuejuan LiuFei ZhaoPublished in: IEEE Access (2020)
Keyphrases
- regression model
- lot sizing
- single item
- multi item
- multistage
- rolling horizon
- setup cost
- response variable
- setup times
- lead time
- cutting stock
- linear regression model
- inventory systems
- production planning
- lot size
- joint replenishment
- mixed integer programming
- regression methods
- explanatory variables
- regression analysis
- assembly systems
- fixed cost
- dynamic programming
- model selection
- prediction model
- generalized linear models
- interval valued data
- scheduling problem
- planning horizon
- production cost
- lower bound
- optimal solution
- upper bound
- single product
- multivariate regression
- stochastic inventory control
- bayesian networks