Login / Signup
Co-scheduling of datacenter and HVAC loads in mixed-use buildings.
Tianshu Wei
Mohammad A. Islam
Shaolei Ren
Qi Zhu
Published in:
IGSC (2016)
Keyphrases
</>
scheduling problem
scheduling algorithm
response time
load balancing
round robin
fault diagnosis
parallel machines
resource constraints
dynamic response
minimize total
resource allocation
preventive maintenance
resource utilization
flexible manufacturing systems
scheduling strategy
urban environments
manufacturing cell
dynamic scheduling
batch processing
real time database systems
production scheduling
data mining
grid computing
special case
decision trees