Co-scheduling of datacenter and HVAC loads in mixed-use buildings.
Tianshu WeiMohammad A. IslamShaolei RenQi ZhuPublished in: IGSC (2016)
Keyphrases
- scheduling problem
- scheduling algorithm
- response time
- load balancing
- round robin
- fault diagnosis
- parallel machines
- resource constraints
- dynamic response
- minimize total
- resource allocation
- preventive maintenance
- resource utilization
- flexible manufacturing systems
- scheduling strategy
- urban environments
- manufacturing cell
- dynamic scheduling
- batch processing
- real time database systems
- production scheduling
- data mining
- grid computing
- special case
- decision trees