A rolling horizon approach for material requirement planning under fuzzy lead times.
Manuel Díaz-MadroñeroJosefa MulaMariano JiménezDavid PeidroPublished in: Int. J. Prod. Res. (2017)
Keyphrases
- lot sizing
- rolling horizon
- assembly systems
- lead time
- production planning
- single item
- multi item
- multistage
- inventory systems
- supply chain
- service level
- planning horizon
- single product
- poisson process
- setup cost
- inventory control
- holding cost
- random variables
- fixed cost
- production cost
- asymptotically optimal
- total cost
- independent and identically distributed
- stochastic demand
- production system
- utility function
- steady state
- stochastic lead times