Two-Stage Assembly Flow Shop Scheduling Problem with Sequence-Dependent Setup Times.
Qiunan MengDi QiuYali LiuPublished in: CASE (2023)
Keyphrases
- sequence dependent setup times
- single machine
- single machine scheduling problem
- scheduling problem
- parallel machines
- setup times
- flowshop
- precedence constraints
- release dates
- lot sizing
- branch and bound algorithm
- processing times
- dynamic programming
- optimization problems
- response time
- setup cost
- upper bound
- multi item