The scheduling for parallel machines with periodic maintenance and setup activities.
Shu-Hsing ChungYu-Ting TaiPing-Hung TsaiPublished in: MSV (2005)
Keyphrases
- parallel machines
- scheduling problem
- unrelated parallel machines
- minimize total
- total tardiness
- sequence dependent setup times
- precedence constraints
- weighted tardiness
- release dates
- maximum lateness
- massively parallel
- parallel computing
- preventive maintenance
- setup times
- shared memory
- single machine
- single server
- flowshop
- scheduling jobs
- lot sizing
- open shop
- bayesian networks
- np hard
- identical parallel machines
- search algorithm