Login / Signup

Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing.

Ruud H. TeunterKonstantinos KaparisOu Tang
Published in: Eur. J. Oper. Res. (2008)
Keyphrases
  • production line
  • production planning
  • production process
  • production system
  • buffer allocation
  • multistage
  • material handling
  • lot size
  • lot sizing
  • life cycle
  • production cost
  • real time