Capital flow constrained lot sizing problem with loss of goodwill and loan.
Zhen ChenRen-qian ZhangPublished in: CoRR (2017)
Keyphrases
- lot sizing
- multistage
- single item
- multi item
- rolling horizon
- inventory systems
- assembly systems
- cutting stock
- mixed integer programming
- production planning
- setup times
- planning horizon
- lead time
- setup cost
- mixed integer
- fixed cost
- mixed integer program
- supplier selection
- stochastic inventory control
- machine learning
- parallel machines
- production rate
- search algorithm