Fix-and-optimize heuristics for capacitated lot sizing with setup carryover and backordering.
Hacer Güner GörenSemra TunaliPublished in: J. Enterp. Inf. Manag. (2018)
Keyphrases
- lot sizing
- setup cost
- multi item
- multistage
- rolling horizon
- single item
- production planning
- mixed integer
- setup times
- inventory systems
- multi period
- lead time
- assembly systems
- planning horizon
- mixed integer programming
- supplier selection
- cutting stock
- fixed cost
- lot size
- mixed integer program
- stochastic inventory control
- facility location
- production rate
- bayesian networks
- parallel machines
- linear programming
- probability distribution