Modeling the Capacitated Multi-Level Lot-Sizing Problem under Time-Varying Environments and a Fix-and-Optimize Solution Approach.
Meng YouYiyong XiaoSiyue ZhangShenghan ZhouPei YangXing PanPublished in: Entropy (2019)
Keyphrases
- lot sizing
- mixed integer
- multi item
- multistage
- mixed integer programming
- single item
- rolling horizon
- mixed integer program
- assembly systems
- inventory systems
- setup times
- multi period
- cutting stock
- production planning
- lead time
- planning horizon
- optimal solution
- supplier selection
- setup cost
- fixed cost
- lot size
- production rate
- stochastic inventory control
- integer programming
- resource allocation
- dynamic programming