Scheduling flexible flow lines with sequence-dependent setup times.
Mary E. KurzRonald G. AskinPublished in: Eur. J. Oper. Res. (2004)
Keyphrases
- sequence dependent setup times
- scheduling problem
- parallel machines
- single machine
- single machine scheduling problem
- release dates
- precedence constraints
- setup times
- flowshop
- total weighted tardiness
- weighted tardiness
- maximum lateness
- lot sizing
- minimize total
- processing times
- setup cost
- branch and bound algorithm
- multi item
- tabu search
- search procedure
- job shop
- special case
- lower bound