Login / Signup
Minimum adjustment cost-based multi-stage goal programming models for consistency improving and consensus building with multiplicative reciprocal paired comparison matrices.
Zhou-Jing Wang
Ye-Kui Wu
Published in:
J. Oper. Res. Soc. (2022)
Keyphrases
</>
multistage
goal programming
minimum cost
lot sizing
trade off
dynamic programming
production system
fuzzy sets
optimal policy
single stage
control system
multi objective
total cost
lot size
conflicting objectives
assembly line balancing