Lead time considerations for the multi-level capacitated lot-sizing problem.
Christian AlmederDiego KlabjanRenate TraxlerBernardo Almada-LoboPublished in: Eur. J. Oper. Res. (2015)
Keyphrases
- lead time
- lot size
- lot sizing
- multi item
- inventory systems
- supply chain
- setup cost
- single item
- setup times
- service level
- stochastic lead times
- total cost
- inventory control
- infinite horizon
- planning horizon
- production planning
- assembly systems
- holding cost
- single product
- poisson process
- cost reduction
- random variables
- mixed integer
- upper bound
- single stage
- replenishment policy
- stochastic demand
- mixed integer programming
- utility function
- finite horizon