A note on a lot sizing heuristic for deteriorating items with time-varying demands and shortages.
Bibhas Chandra GiriT. ChakrabartyK. S. ChaudhuriPublished in: Comput. Oper. Res. (2000)
Keyphrases
- lot sizing
- replenishment policy
- single item
- rolling horizon
- planning horizon
- cutting stock
- lead time
- lot size
- mixed integer program
- mixed integer programming
- multistage
- multi item
- joint replenishment
- production planning
- inventory systems
- supply chain
- assembly systems
- fixed cost
- setup times
- setup cost
- service level
- dynamic programming
- total cost
- inventory models
- search algorithm
- holding cost
- inventory control
- simulated annealing
- long run
- packing problem
- bin packing
- optimal policy
- ordering cost