A memetic ready-mixed concrete scheduling method based on bidirectional collaborative optimisation for highway construction.
Zhenyu LuoGuoqing ZouZhiyong LiShaoMiao ChenJianbo XuPublished in: Int. J. Embed. Syst. (2022)
Keyphrases
- high precision
- synthetic data
- experimental evaluation
- computational cost
- high accuracy
- similarity measure
- segmentation algorithm
- support vector machine
- detection method
- preprocessing
- pairwise
- prior knowledge
- cost function
- medical images
- scheduling algorithm
- theoretical analysis
- classification method
- information retrieval
- mutual information
- edge detection
- dynamic programming
- computational complexity
- objective function
- bayesian networks
- decision trees
- feature selection